Extension Foundations

Scope

  • Full site clearance, including removal of trees and vegetation

  • Excavation of a sloped area to prepare for new extension foundations

  • Excavation of 2400mm deep trenches, with installation of clay master heave protection

  • Concrete foundation pour

  • Final site clearance and preparation for brickwork phase

Project Challenges

Limited space for disposal of waste

Excavations were around live incoming services to the house

Deep excavations require constant monitoring

Inspection by Thames water due to main drain

Project outcomes

  • Thorough clearance and safe tree removal created a clean, accessible site.

  • Sloped ground expertly leveled for a stable foundation.

  • Deep foundations installed with ground heave protection for lasting strength.

  • High-spec concrete, works passed Building Control first time.

  • Delivered on time, with clear communication throughout.

  • Site handed over immaculate and ready for brickwork.